Company Overview
Industrial Control and Design (ICAD Automation) is a leading industrial automation integrator that has been providing customers with unmatched expertise for best-in-class industrial controls, systems integration and electrical solutions for over three decades. We have an experienced team of professionals with strong technical backgrounds from the disciplines of electrical, water and mechanical engineering that are ready to tackle projects of all sizes.
Our end-to-end expertise allows us to create customized solutions tailored to any customer’s needs. Additionally, our unique approach to industry leading design reduces project time and achieves goals ahead of schedule. We partner with clients to create a transparent process that exceeds all project goals and that will allow for more efficient and secure quality systems.
Our services include but are not limited to:
- Electrical Engineering
- Startup & Commissioning
- Certified UL 508A Panel Shop
- PLC/PAC/HMI Programming
- SCADA Integration
- Panel Assembly
- Development of Permit Set and Specifications
- Site Turnkey Consulting & Project Management
Our in-house panel shop can create:
- PLC/HMI Control Panels
- Motor Control Centers (MCC)
- Drive Panels
- Custom Control Panels
- Remote I/O Control Panels
- Instrumentation and Control Panels
- UL 508A Panels
Our projects can be seen throughout California and across various industries. We are a one-stop shop for many of our customers as we also provide electrical contracting services through our sister company Lighthouse Electrical Inc., a C-10 licensed electrical contractor.
This unique set of capabilities and service offerings, including 24/7 emergency support, make us a full-service company that provides end-to-end electrical solutions.
Our Approach
We do things differently!
We get it—your project needs to be done on time and without surprises, all for the best possible value. Therefore, our goal is to reduce headaches and ultimately make sure you look good to your stakeholders.
No Surprise Change Orders, Guarantee!
Our extensive industry research shows that one major pain point for customers is vendors bidding low to get the job and then submitting change orders to make up the difference. We ask enough questions at quote time and then write out exactly what you will get in our proposal. We guarantee the only time you will get a change order is if you ask for something extra in your scope of work.
On-time Project Completion:
Have a deadline that needs to be met? We guarantee to meet it. If you complete your required milestones, we guarantee ours.
1-Year Warranty with 24/7 Support, for Projects Completed:
Some suppliers may only offer warranty service “when they get around to it.” We have 24/7 support available when you need it.
Certifications & Suppliers
- Certified UL 508A Panel Shop
- ICAD Automation is a registered vendor/supplier of Water Measurement and Monitoring Equipment and Systems on the California State Water Resources Control Board
- Control Systems Integrator Association (CSIA) Certified System Integrator
ICAD Project Managers
Chris Krohn – Project Manager, ISA APM
B.S. Electrical Engineering
Maen Marji – Project Manager
M.S. Electrical Engineering
Maen has earned a master’s degree in electrical engineering specialized in system controls. Over the past 4 years, he has honed skills in industrial automation, specializing in complex processes related to Dairies, Food & Beverage, Agriculture, and other industries. His proficiency extends to Siemens systems and VFDs (Variable Frequency Drive). Maen is known for his ability to succeed in assigned tasks to ensure project execution is on time and on budget. His high technical knowledge
is his number one strength, allowing him to tackle even the most intricate engineering problems with confidence.
Jose Vega – Project Manager
B.S. Electrical Engineering
Jose is a driven controls engineer whose passion for automation shines through in every project he undertakes. With four years of intensive experience in the field, he has carved a niche for himself in PLC, HMI, and SCADA programming, transforming complex processes into streamlined and easy to control systems. His understanding of mechanical processes allows him to see beyond the surface, providing innovative solutions that drive efficiency and success. Jose’s technical proficiency is matched by his meticulous attention to detail, ensuring that every aspect of his work adheres to the highest standards of precision.
Henry Kong – Service/Technical Manager
B.S. Electrical Engineering
With over 25 years at ICAD / Lighthouse Electrical, Henry is a technical guru when it comes to problem solving existing platforms, upgrading legacy units to become technically relevant and assisting customers in effective system integration so they can focus more on their customers and growth and less on their operations. Henry is recognized as a staple in the industry as a man who can manage teams that tackle projects of all sizes with a willing heart to educate his customers on how to make their systems as efficient as possible.
Lighthouse Electrical Project Managers
Brian Watts
Project Manager
Brian’s electrical career started in the field, acquiring the vital hands-on experience, technical skill, and practical knowledge that sets him apart. His natural leadership mentality, organizational skills, and impeccable work ethic make him a great project manager. As a part of Lighthouse Electrical for the last 9 years, Brian has learned the ins-and-outs of project environments, budgeting, scheduling, and contractual documentation. This valuable experience allows him to work within established time frames to ensure that work is completed in conformity with quality work standards, projected man-hours, and regulatory compliance requirements. Brian leads from a perspective of cohesion. With both his customers and his teams in mind, he works towards creating an environment of clear communication and expectations, seeking the most fair and equitable solutions when problems arise.
Monica Manzo
Project Manager
References
Contact us for a list of project references.
Company Organization
Statement of Qualifications - Electrical Contractors
Bockmon & Woody
West Village Pump Station
Stockton, CA | $77,672.81
Project Scope:
- Provide one (1) “Lake 1 PS Control Panel” built per customer’s specifications.
- Provide instrumentation as required.
- Provide programming for integration of ICAD-provided hardware.
Materials Provided:
A. Control Panel 1 (Lake 1 Panel)
- Mild Steel NEMA 4/12 enclosure with back panel
- CompactLogix PLC with I/O as shown in P&IDs
- C-More 7” HMI
- Cellular Modem
- UPS
- 24VDC Power Supply
- Ethernet Switch
- Customer Supplied Power Requirements: 120VAC 1PH
- Circuit Breakers, Terminals, and Fuses as required
- UL 508A Certification
B. Control Panel 2 (Lighting)
- Mild Steel NEMA 4/12 enclosure with back panel
- Time Clock
- Photocell
- (2) Lighting Contactors
- (2) 3-Position Switches
- Heater with Thermostat
- Panel Light
- Circuit Breakers & Fuses as required
C. Control Panel 3 (Fan)
- Mild Steel NEMA 4/12 enclosure with back panel
- Current Sensing Relay Switch
- Circuit Breaker
D. Selected Field Devices
- (4) Level Switches
- (6) Pressure Gauges
- (4) Hand Switches
- (3) Limit Switches
- (2) Key Switches
- (2) Key Switch Locks
E. Software
- Studio 500 Full Edition
Eagle Energy Systems
CCTV Cameras
Fresno, CA | $145,996
Project Scope:
A. Pulling CAT5e Cables to (14) Security Cameras
- (7) Cameras in Warehouse
- (4) Cameras in Prime Slide
- (3) Cameras in Call Center
B. Install Conduit as Needed
- Install conduit where required to support camera cable runs
C. Install (14) Customer-Provided Security Cameras and Mounts
- Camera orientation will be in accordance with referenced information
D. Connect New Cameras
- Connect to existing components and equipment
Wild Electric
Cargill Nitrogen Chillers
Fresno, CA | $34,591.86
Project Scope:
A. PLC Program to Include
- Nitrogen-based cooling similar to the CO2 System
- Development of sequence of operations with Wild Electric/Cargill and programming to that sequence
- PLC programming messaging back to the Refrigeration System for monitoring of O2 sensor
B. HMI/SCADA Programming to Include
- Navigation on SE to new Nitrogen screen
- Ability to change setpoints of the Nitrogen System
- Ability to switch between CO2 system and Nitrogen system for cooling
C. On-site Commissioning
- Provided on-site commissioning services
D. Safety Output Relays and Engineering
- Provided material and labor for two (2) Safety Output Relay Cards and accessories
- Included engineering labor to update AutoCAD drawings and perform panel assembly rework
Fresno Grind Palletizer Project
Fresno, CA | $19,001.60
Project Scope:
- Programming of the Benda PLC to remove the Benda items after the Robot, including:
- Lantech Wrapper, Conveyors PT60-64, RIOs in the Robot Cell, Freezer Door
- Disabling alarms and handshaking related to the removed equipment
- Program HMI changes related to the removed equipment
- Commissioning and startup provided
Statement of Qualifications - Food & Beverage
Ruiz Foods
DeviceNet Upgrade at Engine Room
Dinuba, CA | $273,273
Project Scope:
- Replace DeviceNet communication modules with Ethernet modules as required for starters
- Replace DeviceNet connections in existing control panels with Ethernet switches as required
- Replace (1) Allen Bradley 1336 VFD, (1) Fuji VFD, and (1) PowerFlex 523 with PowerFlex 525s
- Replace (1) Square D Size 1 Contactor with an Allen Bradley Contactor and E300 overload
- Replace (11) PowerFlex 40/400/700/70 VFDs with PowerFlex 753s and PowerFlex 525s
- Furnish and install (1) Remote I/O Rack for existing MCC
- Replace (2) Stack Lights
- Replace existing DeviceNet cable with Cat6 cable utilizing existing conduit
- Replace (4) existing Square D PQMs with GE Power Quality Meters (PQMs)
Dinuba Shipping Refrigeration
Dinuba, CA | $65,304
Project Scope:
The existing Dinuba shipping cold storage control system was operating on legacy control (i.e., SLC
504 PLC and PanelView 550 HMI) and networking components (i.e., DH+). The system upgrades will
update the system network to support an Ethernet network, and the control components proposed
are modern hardware with far superior availability as compared to legacy components. Moving
forward, the system will be easier to operate, maintain, and troubleshoot. To eliminate the risk of
potentially significant downtime, the system migration was executed in a timely manner.
- Electrical Drawings
- HMI/PLC Programming
- Panel Assembly/Modifications
- Factory Acceptance Testing
- Onsite Startup Services
VFD CP Builds
Dinuba, CA | $19,159
Project Scope:
- Provide panel design and build of qty, 2ea VFD CPs
- 1 – VFD N4x CP with the following:
- 3ea – PowerFlex 525 1HP 480VAC VFDs
- 3ea – 22.5mm start/stop/speed potentiometers
- 1ea – Fused disconnect
- 1ea – E-stop
Unnamed Client
Engineering and Controls Design
Bay Area, CA | $157,600
Project Scope:
- Provide Engineering and Design Services.
Controls Package Components
Bay Area, CA |$476,373
Project Scope:
- Provide materials and services:
- Motor Control Panel
- Operator Controls SCADA Hardware & Software
- PDC
PLC Programming Software & Installation
Bay Area, CA | $6,829
Project Scope:
-
Studio 500 Logix Designer (Ladder Logic) PLC Programming Software & Remote
Installation.
New O2 Probe & Transmitter Integration
Bay Area, CA | $7,543.56
Project Scope:
- Controls integration of new O2 sensors and transmitters including:
- Modifications to (2) existing AT-218 M-T VP8 cables as required for wire nut splices in existing JB
- Fabricate and install gasketed stainless steel adapter plates for (2) Red Lion PX2CHZ00 controllers
- Modify panel wiring to accommodate (2) Red Lion controllers and (2) Z788 IS barriers
- Perform loop checks, Red Lion programming, and startup support
- Red line drawings and produce As Built set
LiDestri Food and Drink
Refer Trailer Incubation
Fresno, CA | $49,471
Project Scope:
- Furnish and install (2) Control Panels (one per trailer)
- Install the following customer-supplied devices in two trailers:
- (2) Heaters
- (1) Chart recorder
- (3) Temperature monitoring devices
- Furnish and install temporary power for Control Panels and customer-provided equipment
- Provide data logging and online graphical temperature readings
HMC Fresh Fruit, LLC
Ignition KPI Dashboard
Kingsburg, CA | $63,970
Project Scope:
- Provide Ignition Software install and develop a historical database (on a customer
provided server). SCADA will also develop a local and web access display for
identified metrics of new and existing equipment.
CP1 HMI Conversion to Ignition
Kingsburg, CA | $12,400
Project Scope:
- Provide CP1 HMI conversion services to Ignition
- Provide CP1 Advantech PC and Hope monitor
Ignition SCADA Phase II
Kingsburg, CA | $12,400
Project Scope:
- Provide up to (80) eighty straight-time hours of engineering support.
Ignition SCADA Overhaul
Kingsburg, CA | $58,850
Project Scope:
- Provide (1) new Ethernet cable from the IDF panel to the “Rochin” panel
- Provide (1) 1783-NATR with (1) Power Supply in the “Rochin” panel
- Provide stainless steel control drops from the ceiling (Ewon) to (2) x-ray machines
- Provide SCADA/PLC programming as required
Harris Ranch Beef Company
Biogas Project
Selma, CA | $109,878
Project Scope:
- Provide (1) PLC Control Panel
- Provide programming for control and integration of Biogas Recovery equipment
- Provide startup/commissioning
- Provide Wonderware SCADA modifications to include the Biogas Recovery system
Statement of Qualifications - Food & Beverage (Dairy)
Lactalis Heritage Dairy
Electrical Power to Feta and UF
Tulare, CA | $1,037,501
Project Scope:
Three Phase Power – UF
- Furnish and Install (1) 1200A HPC in the existing lineup at US-2.
- Furnish and install conduit and conductors from US-2 to (1) new Motor Control Center (MCC).
- Install (10) customer provided Variable Frequency Drives (VFDs) in existing MCCs.
- P-3202-1.
- P-3841-1.
- 12-P-101, 12-P-102, 12-P-103, & 12-P-104.
- 13-P-101, 13-P-201, 13-P-102, & 13-P-301.
- Furnish and install cable tray and cable from MCCs to each zone.
- Furnish and install PVC coated rigid conduit drops and stainless junction boxes as required for power at each zone.
- Furnish and install conduits and conductors from junction boxes to each motor location.
- Furnish and install local disconnects as required and provide flex terminations to each motor in each zone. (36) motors.
- Update client provided electrical drawings with motor/pump modifications.
Three Phase Power – Feta
- Furnish and install (1) transformer for Tecnal-provided equipment.
- Furnish and install conduit and conductors from the transformer to (1) robot bay.
- Furnish and install cable tray and cable from MCC to each motor location.
- MCC by others.
- Furnish and install PVC coated rigid conduit drops and stainless junction boxes as required at each motor location for power.
- Furnish and install local disconnects as required and provide flex terminations to each motor in each zone. (33) motors.
Three Phase Power – Whey Management
- Install (6) customer provided VFDs in existing MCCs.
- 23-P-101, 23-P-102, 23-P-201, 23-P-202, 23-P-301, & 23-P-302.
- Furnish and install conductors from MCC to each motor location.
- Furnish and install a PVC coated rigid conduit drop at (1) new motor location for power.
- Furnish and install (1) local disconnect and provide flex termination to each motor in zone. (6) motors.
Qualtech Feta Controls
Tulare, CA | $293,714
Project Scope:
- Furnish and install Galvanized Basket Tray in the interstitial area for Qualtech Controls
- Furnish and install Stainless Basket Tray drops in production areas.
“Tecnal Plates” are required for transitioning from the interstitial area to the production area.
“Tecnal Plates” by others. - Furnish and install Shielded Cat6 cable as required for communication/control
- Furnish and install Tray Cable as required for 120VAC power
Clauger
Lactalis Heritage Dairy Feta Refrigeration
Tulare, CA | $394,680
Project Scope:
Electrical – Cable Tray and Cable Installation with Terminations:
- Furnish and install steel basket tray above the ceiling as required for power and controls.
- Install customer-provided Remote I/O panel above ceiling.
- Provide ceiling penetration as required for customer-provided equipment and instrumentation.
- Furnish and install stainless steel sleeves and heat shrink for all LEI-provided ceiling penetrations.
- Install customer-provided stainless-steel hardware for cable drops.
- Provide roof penetration as required for customer-provided roof-mounted units.
- Includes weatherproof seals.
- Furnish and install conduit and fittings as required for roof-mounted equipment.
- Furnish and install cable for power and controls.
- Includes food-grade detectable wire ties where needed.
- Provide terminations for all cables provided by LEI.
California Dairies, Inc.
Truck Wash
Visalia, CA | $153,802.77
Project Scope:
- Provide (3) Control Panels built per customer-provided scope:
- 1 for the PLC (Programmable Logic Controller)
- 1 for the solenoid actuated valve panel with 48 solenoids
- 1 SCADA (Supervisory Control and Data Acquisition) Interface Control Station
- Provide programming and commissioning services:
- Integration into existing system:
- Seamlessly incorporate new process controls into existing setup and ensure compatibility and smooth transitions
- On-Site Commissioning:
- Practical testing steps mirror those during control panel build testing
- Verify that system meets customer needs and specifications
- Integration into existing system:
Tecnal Synext Group
Feta Cable Tray Installation
Tulare, CA | $118,720
Project Scope:
- Furnish and install galvanized steel cable tray in accordance with customer-provided drawings:
- (1) Tray of Power
- (1) Tray for Controls
- All cable feed-through boxes installed by Tecnal
- All stainless-steel cable trays required in the production area are to be furnished and installed by Tecnal
Feta Expansion Cable Installation
Tulare, CA | $235,000
Project Scope:
- Furnish and install Tray Cable for power and controls as required.
- Install customer provided cable as required.
Qualtech
Zones 2 & 13 Control Modifications
California | $69, 892
Project Scope:
- Re-route conduit and wire from control panels CC-30150 and CC-3015A to the New Combined Air panel.
-
Install new conduit and cables for one (1) flow transmitter and one (1) pressure transmitter that will be relocated to the new Combined Air panel.
- Conduit and cables installed before shutdown.
- Terminations made during shutdown.
-
Install conduit and cables from the following locations to the Zone 13 control panel:
- New Combined Air panel: Three (3) 4/c-14 w/shield & one (1) 4/c-18 w/shield.
- Starter HTST SOV Panel: One (1) 4/c-14 w/shield
- Starter HTST/CIP Panel: Two (2) 4/c-18 w/shield
- Parm HTST Control Panel: Three (3) 4/c-18 w/shield
- All conduits and cables installed before the shutdown. Terminations done during the shutdown.
Statement of Qualifications - Food & Beverage (Nut)
Livingston Farmers Association
Huller Expansion Phase 2
Livingston, CA | $224,200
Project Scope:
- Furnish and install a 75kVA transformer, 200A 208V 3-phase load center:
- Furnish and install conduit, conductors, and breakers
- Furnish and install conduit and conductors for color sorter
- Furnish and install conduit and conductors for Inshell Separation equipment:
- Stage 1A (5 motors)
- Stage 1AB (3 motors)
- Stage 5A (5 motors)
- Stage 5AB (3 motors)
- Stage 6A (5 motors)
- Furnish and install conduit and conductors for Pre-Cleaner:
- (2) Shaker motors
- (2) Destoner motors
- (1) Pre-Cleaner motor
- Supply 110V for the lifting arm and LED fixture
- Furnish and install conduit and conductors for (3) Hull Augers
- Furnish and install conduit and conductors to relocate (1) Hull Auger
- Furnish and install conduit and conductors for new LED flood lights in the Hull area
Touchstone Pistachio
Upgrade Hullers & Dryers
Fresno, CA | $541,997
Project Scope:
- Demo the existing Huller MCC-A and Dryer MCC-B and MCC-B:
- Disconnect and remove unnecessary conduit and wire from the existing system
- Furnish and install a new distribution panel fed from the (E) Switchboard:
- Install in the huller area to feed the motor control panel (MCP‐A)
- Install feeder conduit and wire for new distribution panel
- Install the new MCP‐A (provided by ICAD)
- Install conduit and wire from the new MCP‐A to the new huller and floater conveyor system:
- Power and controls to motors and field devices based on the motor and I/O list generated by ICAD
- Install a new distribution panel for the new dryer:
- Modify (E) panel to distribute power and controls from the local distribution panels and the (E) MCP-D panel to motors and field devices in the dryer area
- Install conduit and wire for power and controls from the local distribution panels and the (E) MCP-D panel to motors and field devices in the dryer area:
- Power and controls to motors and field devices based on the motor and I/O list generated by ICAD
Sierra Valley Hulling
Auger Line Replacement
Firebaugh, CA | $203,325
Project Scope:
- Demo existing electrical system for Hull storage
- Replace underground conduit and conductors for each Hull storage line:
- From the pull box near Hulling Building to each Hull storage line
- Replace the underground pull box near hull line #1 with a traffic-rated box and lid
- Install new underground traffic-rated pull boxes and new hull lines #2 & #3
- Re-use existing underground conduit between column supports
- Replace conductors in existing underground conduit between column supports
- Replace all overhead conduits and conductors feeding each motor (8) and lights
- Replace all flood lights
RPAC Almonds
Sizer Room
Los Banos, CA | $463,400
Project Scope:
- Provide trenching for electrical
- Furnish and install underground conduit and conductors as required for power and controls
- Provide backfill and compaction
- Furnish and install (1) Motor Control Panel (MCP)
- Furnish and install (1) Fan Control Panel (FCP)
- Furnish and install (1) Stand-alone 250HP RVSS
- Furnish and install conduit and conductors from underground stub-ups to equipment as required
- Furnish and install conduit and conductors as required for power/control to (5) Intake Fans and (10) Louvers:
- Fans and Louvers by others
Engineering/Integration Services Provided:
- Control System Engineering consisting of:
- ICAD Standard Preliminary Engineering Package:
- Network architecture diagram depicting networking of items provided by ICAD
- Control panel external & internal layouts with BOM
- Control panel wiring schematics
- As-built engineering package consisting of:
- Updated preliminary engineering package
- O&M manual describing the operation of the system
- ICAD Standard Preliminary Engineering Package:
- HMI Programming
- PLC Programming in accordance with the customer’s approved sequence of operations
- Panel Assembly
- Factory Acceptance Testing
- Onsite Startup Services
Statement of Qualifications - General Contractors
MCS Construction
Catalina SCADA Integration
Catalina Island, CA | $502,691
Project Scope:
- Validate instrumentation (flow transmitters, pressure transmitters, flow totalizers, ratio controllers)
- Modify local program logic for additional monitoring and alarms
- Install Advantech Panel PC
- Install new server for SQL database management
- Update Wonderware monitoring, alarming, and historization
- Validate holistic system operation with contracted Customer Site Representative
- Co-develop the Operation and Maintenance Manual (O&M Manual) with the General Contractor
- Provide operator on-site training
W.M. Lyles Co.
Root Creek Groundwater & Arsenic
Madera, CA | $3,135,000
Project Scope:
Electrical – General
- Furnish and install (7) exterior Light Standards and Bases per referenced information
Electrical Building
- Furnish and install PG&E transformer pad and underground conduit for new service per referenced information
- Furnish and install (1) 2000A MSB with ATS and “EDP” section, MCC1, 75 KVA Transformer “TX-P1”, 120/208V Panel “P1”, and network rack per referenced information
- Furnish and install (15) UG pull boxes, conduit, and fiber optic cable to (E) well sites 1, 2, and 11
- Furnish and install (4) 3×5’ UG electrical vaults: S1, P1, S2, and P2
- Furnish and install wireways, devices, instrumentation, junction boxes, conduit, and conductors at Water Sampling Station per referenced information
- Furnish and install (3) 200HP VFDs per referenced information
- Furnish and install lighting, receptacles, conduit, risers, and wire per referenced information
- Furnish and install all grounding per referenced information
Maintenance Building
- Furnish and install 75KVA Transformer “TX-ML” and 120/208V Panel “ML” per drawing
- Furnish and install (2) 3×5’ UG electrical vaults: S7 and P7
- Furnish and install lighting, receptacles, conduit, risers, and conductors per referenced information
- Furnish and install all grounding per referenced information
Process 20
- Furnish and install conduit, risers, junction boxes, and conductors per referenced information
- Furnish and install instrumentation per referenced information
Process 30
- Furnish and install the Vessel Control Panel “30-VCM-01”
- Furnish and install (2) 3×5’ electrical vaults: S4 and P4
- Furnish and install conduit, risers, junction boxes, and conductors per referenced information
- Provide instrumentation per referenced information
- Furnish and install all grounding per referenced information
Process 40
- Furnish and install “LIT-40-04/B” and “CV-40-01” NEMA 4X cabinets per referenced information
- Furnish and install conduit, risers, junction boxes, and conductors per referenced information
- Furnish and install instrumentation per referenced information
- Furnish and install all grounding per referenced information
Process 50
- Furnish and install conduit, risers, junction boxes, and conductors per referenced information
- Furnish and install instrumentation per referenced information
- Furnish and install all grounding per referenced information
Process 60
- Furnish and install (5) NEMA 4X Disconnects per referenced information
- Furnish and install (1) 3×5’ UG electrical vault P-6
- Furnish and install conduit, risers, junction boxes, and conductors per referenced information
- Furnish and install instrumentation per referenced information
- Furnish and install all grounding per referenced information
Process 70
- Furnish and install 200A “MCC2” with 30KVA Transformer and 120/208V panel “P2”
- Furnish and install (2) 3×5’ UG electrical vaults S5 and P5
- Furnish and install lighting, receptacles, conduit, risers, and conductors per referenced information
- Furnish and install instrumentation per referenced information
- Furnish and install all grounding per referenced information
Electrical Standby Generator
- Furnish and install Emergency Generator
Instrumentation and Controls
- Provide (1) PLC Panel (WTP-PCM-01) with redundancy
- Provide (1) RIO Panel (WTP-PCM-02)
- Provide (1) Network Rack
- Provide Instrumentation
- Provide PLC programming for integration
- Provide commissioning assistance
Bratney Companies
Germains Castroville Seed Conditioning Controls
Gilroy, CA | $138,032
Project Scope:
- Provide control panels, associated programming, and select instruments
Germains POF Phase I
Gilroy, CA | $9,978
Project Scope:
- Develop engineering design for the Germain’s POF automation project. The deliverable is a POF automation & electrical scope of work document.
Germains POF Phase II
Gilroy, CA | $49,200
Project Scope:
- Demo existing conduit for 480V fan power and 120V pulse cleaning controller power unit to the wall
- Replace SS1214 with a new soft start that supports the larger 40HP fan motor (to be installed in a new enclosure)
- Pull larger wire for new fan from (N) Soft Start panel
- Install new conduit as required to make connections to replacement equipment
Statement of Qualifications - Manufacturing
Oldcastle Precast, Inc.
Columbia Box Line
Madera, CA | $95,435
Project Scope:
- Demo existing control panel
- Furnish and install (1) Control Panel
- Furnish and install (1) HMI Panel
- Furnish and install conduit and conductors for power to Control and HMI Panels
- Furnish and install conduit and conductors from Control Panel to machine-mounted instrument
- Furnish and install conduit and conductors from Control Panel to machine-mounted motors
- Provide proximity switches as required to replace photo-eyes
- Provide programming for integration
- Provide onsite commissioning
Xtraction, Inc.
Shredder Electrical Design
Fresno, CA | $5,142
Project Scope:
- Electrify the following loads from the existing 1600A switchboard:
- (1) New Shredder:
- Electric Drive #1
- Electric Drive #2
- Electric Drive #3
- Screen Assist HPU
- (1) New 50A Receptacle
- (1) New Shredder:
- Deliverables:
- Single Line & Grounding Diagrams
- Power Plan
- Panel Schedules for the affected panels
- Develop 100% submittal package based on the 90% submittal package with customer comments
- If a new switchboard is required:
- Title 24 drawings
Power to Shredder
Fresno, CA | $74,800
- Furnish and install (4) Molded Case Circuit Breakers in existing switchboard to feed (1) new Shredder
- Furnish and install (1) Molded Case Circuit Breaker in existing switchboard to feed (1) new 50A Receptacle
- Furnish and install conduit and conductors feeding new Shredder that includes the following:
- 400A – Electric Drive #1
- 400A – Electric Drive #2
- 400A – Electric Drive #3
- 30A – Screen Assist HPU
- Furnish and install conduit, conductors, and hardware for (1) 50A Receptacle
Guardian Industries Corp.
10 VFD Installation
Kingsburg, CA | $34,100
Project Scope:
- Furnish and install (9) 7½ HP VFDs replacing existing ones
- Furnish and install (2) 1756-EN2T Ethernet modules
- Replace the existing ControlNet cable with an Ethernet cable for each VFD utilizing the existing conduit
- Provide (1) additional 7½ HP VFD for a spare
- Provide cleaning services for (16) electrical control panels:
- Vacuum dust and debris
- Tuck loose wires into Panduit
- Replace missing Panduit cover as required
Statement of Qualifications - Mechanical & Process Contractors
Tecnal Synext Group
Feta Cable Tray Installation
Tulare, CA | $118,720
Project Scope:
- Furnish and install galvanized steel cable tray in accordance with customer-provided drawings:
- (1) Tray for Power
- (1) Tray for Controls
- All cable feed-through boxes furnished and installed by Tecnal
- All stainless-steel cable trays required in the production area furnished and installed by Tecnal
Feta Expansion Cable Installation
Tulare, CA | $235,000
Project Scope:
- Furnish and install Tray Cable for power and controls
- Install customer-provided cable as required
Qualtech
Zones 2 & 13 Control Modifications
California | $69,892
Project Scope:
- Re-route conduit and wire from control panels CC-3015 and CC-3015A to the new Combined Air panel
- Install new conduit and cables for one (1) flow transmitter and one (1) pressure transmitter relocated to the new Combined Air panel:
- Conduit and cables installed before shutdown
- Terminations made during shutdown
- Install conduit and cables from the following locations to the Zone 13 control panel:
- New Combined Air Panel: Three (3) 4/c-14 w/shield & one (1) 4/c-18 w/shield
- Starter HTST SOV panel: One (1) 4/c-14 w/shield
- Starter HTST/CIP panel: Two (2) 4/c-18 w/shield
- Parm HTST control panel: Three (3) 4/c-18 w/shield
- All conduits and cables installed before shutdown. Terminations done during the shutdown
Clauger
Lactalis Heritage Dairy Feta Refrigeration
Tulare, CA | $394,680
Project Scope:
Electrical – Cable Tray and Cable Installation with Terminations:
- Furnish and install steel basket tray above the ceiling as required for power and controls.
- Install customer-provided Remote I/O panel above ceiling.
- Provide ceiling penetration as required for customer-provided equipment and instrumentation.
- Furnish and install stainless steel sleeves and heat shrink for all LEI-provided ceiling penetrations.
- Install customer-provided stainless-steel hardware for cable drops.
- Provide roof penetration as required for customer-provided roof-mounted units.
- Includes weatherproof seals.
- Furnish and install conduit and fittings as required for roof-mounted equipment.
- Furnish and install cable for power and controls.
- Includes food-grade detectable wire ties where needed.
- Provide terminations for all cables provided by LEI.
Powder Process Solutions
Powder Handing Program Leprino Greeley
Greeley, CO | $69,225
Project Scope:
- Engineering labor for devices included in IO Counts – PS23107-010-Model
Bratney Companies
Cal Corn Growers Overhead Belt Conveyor
Chowchilla, CA | $76,500
Project Scope:
- Furnish and install (1) Motor Control Panel (MCP):
- (1) 15HP VFD
- (1) 3HP VFD
- (1) 15HP FVNR
- (1) 1HP FVNR
- Furnish and install conduit and conductors from an existing 480V panel to the MCP
- Furnish and install conduit and conductors as required from the MCP to each motor:
- Provide local non-fused disconnects
- Furnish and install conduit and conductors as required for (2) 120V circuits
- Provide commissioning services
Statement of Qualifications - Municipal
City of Kerman
Upgrades to Wells 9, 14 & 17
Kerman, CA | $55,541
Project Scope:
- Provide PLC and HMI upgrades for Wells 9 & 17
- Provide PLC upgrade for Well 14
- Provide Chlorine Pump Control at all (3) sites:
- Provide cable connecting customer-provided chlorine pump and PLC
- Provide programming for integration
- Provide commissioning
Replace RVAT at Well 10
Kerman, CA | $11, 420
Project Scope:
- Furnish and install soft start to replace existing Well 10 RVAT
- Demo existing RVAT
- Commissioning by ICAD Automation
Well 14 VFD Replacement
Kerman, CA | $19,483
Project Scope:
- Furnish and install FUJI replacement VFD
- Provide electrical installation
- Provide onsite commissioning
City of Mendota
Well 5 VFD CP Installation
Mendota, CA | $78,300
Project Scope:
- Demo hardware that is no longer needed:
- Existing Pump Panel
- Existing Telemetry Panel
- Furnish and install (1) ICAD – Control Panel
- Furnish and install conduit and conductors for (3) valves
- Furnish and install conduit and conductors for (1) Pressure Transmitter
- Replace broken hub in top of existing Meter Panel
- Furnish and install (1) Yagi Antenna on existing power pole
PLC Upgrades
Mendota, CA | $59,900
Project Scope:
- Water Treatment Plant:
- Upgrade (E) PLC and I/O to Allen Bradley CompactLogix.
- Upgrade (E) HMI to C-more Touchscreen.
- Replace DH+ cable with Cat6 utilizing existing conduit.
- Establish communication between new PLC and (5) existing pumps.
- Filtronics PLC at Water Treatment Plant:
- Upgrade (E) PLC and I/O to Allen Bradley CompactLogix.
- Replace DH+ cable with Cat6 utilizing existing conduit.
- Well Sites 7, 8 & 9:
- Upgrade (E) PLCs and I/O to MicroLogix 1400 PLCs and I/O.
- Upgrade (E) HMIs to C-more Touchscreens.
Water Treatment Plant Generator
Mendota, CA | $242,200
Project Scope:
- Demo (1) existing 200kW standby generator
- Remove (1) existing 400A circuit breaker
- Furnish and install (1) 600A circuit breaker
- Furnish and install conductors for (1) 600A circuit
- Furnish and install (1) 400kW diesel standby generator
Groveland Community Services District
FTVS SE Upgrade
Groveland, CA | $7,215
Project Scope:
- Upgrade FTVS SE SCADA license and installation to increase screen count to 250 screens
Add FTTM & Dream Reports
Groveland, CA | $52,704
Project Scope:
- 1500 Tag Perpetual
- 1k Tag Dream Report and 1.5k Tag Factory Talk Transaction Manager
Two Water Treatment Plant PLC Upgrades
Groveland, CA | $110,400
Project Scope:
- Furnish and install upgrades for (2) legacy PLCs:
- Big Creek 1
- Big Creek 2
- Provide onsite commissioning
Tanks & Lift Stations
Groveland, CA | $69,750
Project Scope:
- Provide generator fuel level sensors as required
- Provide current transducers with relay outputs for tank sites with mixers
- Provide current transducers with analog outputs for 16 lift station motors
- Establish communication between PLC and existing RVSSs (log data in historian)
- Establish analog communication between existing VFDs and PLC
Statement of Qualifications - Water Irrigation Districts
Fresno Irrigation District
SCADA Upgrade
Fresno, CA | $675,000
Project Scope:
- Software Provided:
- Ignition SCADA Software as listed in “Fresno ID Specifications, SECTION 40 68 00 PROCESS CONTROL SOFTWARE”
- Sites Include:
- Base station SCADA software installation/configuration
- (120) remote sites listed below:
Tranquillity Irrigation District
EC Monitoring
Tranquillity, CA | $224,000
Project Scope:
- Provide Engineering Design, PLC/HMI Programming, PLC Components, Radio Telemetry Components, Instruments, Panel Assembly, and Electrical Installation for the following:
- Components and installation of instrumentation at 8 well sites consisting of:
- EC/TDS Sensor
- PH Sensor
- Flow Meter
- Pressure Transducer
- Components and installation of instrumentation at 8 well sites consisting of:
- Components and installation of a new PLC/Radio Telemetry Control Panel at each of the well sites
- New PC Server for the required database software and upgrade Wonderware from 500 tag to 1000 tag license
Install SCADA
Tranquillity, CA | $108,350
Project Scope:
- Provide the necessary control engineering, design, materials, software, and programming to provide a complete and operable SCADA system.
- The SCADA System provided included:
- District Office
- Fresno Slough at R/R
- Tranquillity Irrigation Lift #1
- Tranquillity Irrigation Lift #2
- The PLCs provided are expandable for future functionality and I/O requirements. Each of the remote sites will contain a base PLC with one expansion module. The base unit will provide 10 discrete inputs and 6 discrete outputs. The expansion module will be a 4 channel analog input. The PLCs provided can be expanded with up to three additional I/O modules.
Three 25HP Pumps
Tranquillity, CA | $32,049
Project Scope:
- Controls for a new Booster Pump.
Materials Provided:
- A. Control Panel
- Mild steel NEMA 12 freestanding enclosure.
- Panel-mount air conditioner.
- Flange mount disconnect.
- (3) 25hp PowerFlex 400 VFDs.
- Terminal strips for all control wires going in and out of panel.
- Customer Supplied Power Requirements: 480VAC, 3hp.
- 65kaic @480V SCCR rating.
- UL508A certification.
- B. Control Panel 2 (existing)
- MicroLogix I/O card(s) to accommodate the (3) new VFDs.
- C. Field Devices
- Liquid level sensor for suction side of the booster pump.
- Mercoid high pressure switch for discharge side of booster pumps.
Wigen Iron & Maganese Treatment Skid Integration Implementation
Tranquillity, CA | $29,029
Project Scope:
- Integration services for the Wigen System.
Materials Provided:
- Rack mount Ethernet switch (fiber and copper), power distribution unit and UPS to mount in rack (by others) in new control room.
- Din mount Ethernet switch (fiber and copper) to mount in existing control panel.
- Din mount Ethernet switch (fiber and copper), firewall, power supply & rack, to mount in existing office room.
- UPS for the existing office room.
- Din mount Ethernet switch (fiber and copper, high temperature rated) to mount at tower.
Services Provided:
- Install & configure the Ethernet switches.
- Move computers and establish communication with existing equipment.
- Program SCADA system to communicate with Wigen system through Ethernet.
- Program the existing well PLCs (2) to turn off based on a run interlock from Wigen.
- Program the tank PLC to tell Wigen to run based on the level in the tank.
- Any specific customer programing requirements listed in writing.
- Onsite Startup Services.
Drinking Water Improvement Project
Tranquillity, CA | $84,318
Project Scope:
- Upgrade the existing Usemco Panel:
- Replace the existing PLC with an AB MicroLogix PLC.
- Replace the existing OIU touchscreen.
- Furnish and install an industrial network switch with fiber ports.
- Correct the power terminations for the existing enclose mounted AC unit.
- Remove the existing Sensaphone unit and associated wiring.
- Complete the underground conduit system, installed by others, between the Tranquillity Water District office and the Usemco Panel.
- Install conduit to the attic junction box and from the attic junction box to the server room.
- Furnish and install fiber optic cable between the Usemco panel and the server room and terminate at both ends.
- Furnish and install a new switch for the server room with additional fiber ports for the connection to the Usemco Panel.
- Complete the controls upgrade for well sites 6 & 7:
- Retrieve the used components and new back panels from the instrument sections provided by Telstar.
- Test the old equipment to verify functionality.
- Design, fabricate, and program the upgraded control system utilizing the used PLCs, radios, antennae for control of each well site VFD provided by Telstar.
- Each new control system will include the following items:
- UPS for PLC and radio power backup.
- Monitor and SCADA alarm for the generator when that source is selected and connected.
- Additional I/O per the referenced I/O list.
- Furnish and install an OIU touchscreen enclosure to allow for operator interface of each control system site 6 and 7.
- Install the fabricated back panels and complete control terminations.
- Install the antennae at each site and provide new cable as necessary between each radio and its respective antennae.
- Startup services for each well site control system.
- Upgrade the existing SCADA system and SCADA servers:
- Replace the existing server computers with new.
- Replace the UPS unit for each server.
- The new server computers will have the capacity for the current SCADA system as well as the proposed treatment plant.
- Upgrade the existing Wonderware InTouch software:
- Clean up the installation to remove abandoned tags and data points.
- Bring in the upgraded well sites 6 and 7 into the SCADA system.
- The Wonderware upgrade and cleanup will leave tags for future use.
- Install and configure Wonderware Historian for the upgraded InTouch software:
- The Historian will replace the existing data logging software and provide tags for future use.